EU Battery Regulation (EU) 2023/1542

Conformity assessment and CE marking

Which route applies, what the assessment involves, and how to prepare.
Designation: final stages

Supporting manufacturers now, ahead of designation

NMi Certin is in the final stages of the Notified Body designation process under the EU Battery Regulation. Our experts already support manufacturers with gap assessments and Module D1 preparation, so certification can follow without delay once formal designation is in place.

Available now

Gap assessments, Module D1 preparation, Quick Scan of requirements and evidence

On formal designation

Module D1 assessment and certification under the EU Battery Regulation

Lorem

Which route applies?

Not every battery needs a Notified Body. The route depends on the battery category and how it is produced.

Module A

How a project runs

1

Enquiry

Battery category, target markets and applicable articles

2

Quick Scan

Route, evidence list, time and budget

3

Test evidence

Accredited test reports for the technical file, for example from NMi TESTLAB

4

Assessment

Stage 1 desk review, then Stage 2 on-site audit

5

Certificate

Certificate, EU declaration of conformity, yearly surveillance

Stage 1: desk assessment

Review of the technical file and quality system to confirm readiness for the on-site audit.

Stage 2: on-site audit

At the production site(s), worldwide. Can be combined with carbon footprint verification and ISO 9001.

Module D1

How a project runs

1

Enquiry

Battery category, target markets and applicable articles

2

Quick Scan

Route, evidence list, time and budget

3

Test evidence

Accredited test reports for the technical file, for example from NMi TESTLAB

4

Assessment

Stage 1 desk review, then Stage 2 on-site audit

5

Certificate

Certificate, EU declaration of conformity, yearly surveillance

Stage 1: desk assessment

Review of the technical file and quality system to confirm readiness for the on-site audit.

Stage 2: on-site audit

At the production site(s), worldwide. Can be combined with carbon footprint verification and ISO 9001.

Module G

How a project runs

1

Enquiry

Battery category, target markets and applicable articles

2

Quick Scan

Route, evidence list, time and budget

3

Test evidence

Accredited test reports for the technical file, for example from NMi TESTLAB

4

Assessment

Stage 1 desk review, then Stage 2 on-site audit

5

Certificate

Certificate, EU declaration of conformity, yearly surveillance

Stage 1: desk assessment

Review of the technical file and quality system to confirm readiness for the on-site audit.

Stage 2: on-site audit

At the production site(s), worldwide. Can be combined with carbon footprint verification and ISO 9001.

Plan backwards from launch

  • Test sample preparation and cycling are often on the critical path
  • The quality system audit needs a near-complete technical file
  • Supplier data for carbon footprint and recycled content is usually the longest lead item

What to expect

  • One project manager from enquiry to certificate
  • Auditors with battery engineering backgrounds
  • One assessment covering all applicable articles
  • Clear findings and agreed timelines

Example · LFP module family

A product family approach halved the configurations tested and produced shared evidence once.

6 → 3

configurations tested

47 / 54

tasks shared across the family

Conformity questions

Who must verify the carbon footprint, recycled content and due diligence?

Who must verify the carbon footprint, recycled content and due diligence?

A Notified Body, as part of the conformity assessment. Self-assessment (Module A) is not allowed for these.

Which variant of a product family needs testing?

Which variant of a product family needs testing?

For each requirement, the worst-case variant, usually the configuration with the highest energy and power, as long as cell chemistry, cell type and BMS are the same. Variants with a different chemistry, cell supplier or safety-relevant design need their own evidence. Representative samples are agreed in the Quick Scan.

Can an existing ISO 9001 system be used?

Can an existing ISO 9001 system be used?

Yes. An existing ISO 9001 system can be the basis for the Module D1 quality system, and the audits can be combined.

What can be done before designation is confirmed?

What can be done before designation is confirmed?

The Quick Scan, gap assessments of the technical file and quality system, and Module D1 preparation. Testing can start through an accredited laboratory such as NMi TESTLAB. This work carries over into the formal assessment.

Find out which route applies

The Quick Scan confirms the route, evidence and documents for your battery.

Ivo Pagen

Account Manager

WANT TO KNOW MORE?

CONTACT US!

Cookies

This website uses cookies. A cookie is a simple small file that is sent along with pages from this website [and / or Flash applications] and is stored by the browser on the computer's hard drive. The information stored therein can be sent back to the servers on a subsequent visit.

This website uses functional and analytical cookies. These cookies are used to improve the user experience and to gain insight into visitor statistics. Cookies can be deleted via the browser settings.