NMi Certin is in the final stages of the Notified Body designation process under the EU Battery Regulation. Our experts already support manufacturers with gap assessments and Module D1 preparation, so certification can follow without delay once formal designation is in place.
Gap assessments, Module D1 preparation, Quick Scan of requirements and evidence
Module D1 assessment and certification under the EU Battery Regulation
Not every battery needs a Notified Body. The route depends on the battery category and how it is produced.
Battery category, target markets and applicable articles
Route, evidence list, time and budget
Stage 1 desk review, then Stage 2 on-site audit
Certificate, EU declaration of conformity, yearly surveillance
Review of the technical file and quality system to confirm readiness for the on-site audit.
At the production site(s), worldwide. Can be combined with carbon footprint verification and ISO 9001.
Battery category, target markets and applicable articles
Route, evidence list, time and budget
Stage 1 desk review, then Stage 2 on-site audit
Certificate, EU declaration of conformity, yearly surveillance
Review of the technical file and quality system to confirm readiness for the on-site audit.
At the production site(s), worldwide. Can be combined with carbon footprint verification and ISO 9001.
Battery category, target markets and applicable articles
Route, evidence list, time and budget
Stage 1 desk review, then Stage 2 on-site audit
Certificate, EU declaration of conformity, yearly surveillance
Review of the technical file and quality system to confirm readiness for the on-site audit.
At the production site(s), worldwide. Can be combined with carbon footprint verification and ISO 9001.
A Notified Body, as part of the conformity assessment. Self-assessment (Module A) is not allowed for these.
For each requirement, the worst-case variant, usually the configuration with the highest energy and power, as long as cell chemistry, cell type and BMS are the same. Variants with a different chemistry, cell supplier or safety-relevant design need their own evidence. Representative samples are agreed in the Quick Scan.
Yes. An existing ISO 9001 system can be the basis for the Module D1 quality system, and the audits can be combined.
The Quick Scan, gap assessments of the technical file and quality system, and Module D1 preparation. Testing can start through an accredited laboratory such as NMi TESTLAB. This work carries over into the formal assessment.