08 Apr In MID, non-metrological changes must be listed on the certificate. Does this apply under ATEX?
Posted at 14:34h
in
No — not in the same way. If a change isn’t included in the Ex schedule drawing, and it doesn’t impact safety, re-certification (variation) is not needed. This is why clear, efficient schedule drawings — focused only on relevant elements — are critical. We support you in preparing these correctly to minimise certification complexity.